House utilities — system estimates

Electrical, water, sewage, heating, ventilation — cost ranges per m²

Rough budget

Electrical

$6,000 – $12,000

Outlets/points, panel, cable, service upgrade. Typically 60–100 points per house.

Water supply

$1,500 – $3,750

Well/city water, piping, boiler. Well separately $40–80/m.

Sewage

$1,200 – $3,000

Internal piping + septic/cesspit. Septic $800–3000 separately.

Heating

$3,750 – $9,000

Boiler (gas/electric/solid), radiators or underfloor. Underfloor ~1.5× radiators.

Ventilation

$750 – $4,500

Natural — nearly free; HRV supply-extract — $15–30/m².

Ranges are typical for a private house in Ukraine (2024–2025), excluding premium equipment. Underfloor heating and HRV are the most expensive options. Utilities total — usually 15–20% of house budget.

O Instalacje domu — kosztorysy

Instalacje domu — kosztorysy — Elektryka, woda, kanalizacja, ogrzewanie, wentylacja — zakresy kosztów za m².. Budowa: kosztorys, instalacje, geologia, pozwolenia, budowa zimowa, odbiór, ubezpieczenie, terminy. Korzystaj z naszych narzędzi bez rejestracji i instalacji oprogramowania. Wszystkie obliczenia odbywają się w Twojej przeglądarce — Twoje dane nigdy nie są wysyłane na serwer.