Resource sheet

Materials + labor + machinery → direct costs, overhead, profit, contingency

Resources

Resource method: estimate = sum of resources at current prices (materials + payroll + machinery operation). Overhead and profit accrue on the payroll fund, contingency on the total. Overhead/profit norms follow DBN/ДСТУ ranges by work type. The sheet is the basis for checking a contractor's estimate: demand a materials/labor/machinery breakdown, not a lump sum.

Sheet summary

Direct costs
195 000 UAH
Overhead
21 000 UAH
Profit
6 000 UAH
Contingency
4 440 UAH
Total
226 440 UAH
Materials share
62%