Self-build vs contractor
Materials + labor + mistake losses → real savings
Parameters
A contractor charges 40–60% of material cost for labor (general contractor — more, add 15–20% management). Self-build saves labor but: your time has value (you could be earning), mistakes and rework typically cost 10–20% of materials, timelines run 1.5–2× longer. The most common hybrid: shell by contractor, finishing DIY.
Comparison
- Contractor
- 2 250 000 грн
- Self-build (with time cost)
- 2 655 000 грн
- Saving excl. time
- 75 000 грн
- Real saving
- -405 000 грн