Gas Equipment
Appliance → placement norms and required documents
Placement norms
- •Min boiler room volume: ≤30 kW — 7.5 m³, 30–60 kW — 13.5 m³, 60–200 kW — 15 m³
- •Ceiling ≥ 2.5 m
- •Easily-reset glazing ≥0.03 m² per 1 m³
- •Supply air: 3× air exchange + combustion air
- •Door with grille/gap ≥0.02 m²
Documents
- •Gas supply project (from gas distribution company)
- •Technical conditions for connection
- •Tie-in/gas-start act
- •Boiler passport + service contract
- •Annual chimney/ventilation check protocol
Norms are generalized (based on DBN/DSTU gas system rules). Coordinate the project with the gas distribution company before installation — unauthorized tie-in or relocation is penalized by disconnection.