Resource sheet
Materials + labor + machinery → direct costs, overhead, profit, contingency
Resources
Resource method: estimate = sum of resources at current prices (materials + payroll + machinery operation). Overhead and profit accrue on the payroll fund, contingency on the total. Overhead/profit norms follow DBN/ДСТУ ranges by work type. The sheet is the basis for checking a contractor's estimate: demand a materials/labor/machinery breakdown, not a lump sum.
Sheet summary
- Direct costs
- 195 000 UAH
- Overhead
- 21 000 UAH
- Profit
- 6 000 UAH
- Contingency
- 4 440 UAH
- Total
- 226 440 UAH
- Materials share
- 62%