Self-build vs contractor

Materials + labor + mistake losses → real savings

Parameters

A contractor charges 40–60% of material cost for labor (general contractor — more, add 15–20% management). Self-build saves labor but: your time has value (you could be earning), mistakes and rework typically cost 10–20% of materials, timelines run 1.5–2× longer. The most common hybrid: shell by contractor, finishing DIY.

Comparison

Contractor
2 250 000 грн
Self-build (with time cost)
2 655 000 грн
Saving excl. time
75 000 грн
Real saving
-405 000 грн