Metal structures

Canopy estimate

Frame: 80×80 or 100×100 posts, 40×20 trusses, 1–1.5 m rafter spacing. Profiled sheet or polycarbonate roof. ~25–40 kg/m² steel for a light canopy.

Gates

Sliding: cantilever beam, rollers, counterweight footing — 1.5× opening width. Swing — hinges on 100×100 posts minimum, lock and latch in-frame.

Loads

Snow load — regional norm 70–180 kg/m² in Ukraine. Wind load for tall fences. Span deflection ≤ 1/200. 1.3–1.5 safety factor — don't save on steel.

Welds

Load-bearing welds — full penetration or double-sided. Tee joints with gussets. Check: visual + hammer tap. Critical joints — X-ray/UT by pros.

Corrosion

Clean → metal primer → 2 coats enamel. Underground posts — waterproofing + concrete, else they rot at grade in 5–7 years.

Leave to pros

Spans >6 m, house load-bearing beams, elements above people (facade canopies) — engineered design and certified welder. A mistake here isn't 'reweld' — it's a collapse.

Sobre Estructuras metálicas

Estructuras metálicas — presupuesto marquesina/puerta, cargas, soldaduras, corrosión. Madera y metal: Volumen, peso de perfiles, electrodos, corte, machos. Use nuestras herramientas sin registro ni instalación de software. Todos los cálculos se realizan en su navegador — sus datos nunca se envían a un servidor.