Legalizing replanning

Legalization procedure: project → works → new tech passport

1. What needs legalization

Removing/adding partitions, moving bathroom/kitchen, merging rooms, making wall openings — all replanning requiring a project. Cosmetic repairs and flooring replacement — no.

2. What's forbidden

Moving bathroom/kitchen above neighbors' living rooms, removing load-bearing walls, merging a gasified kitchen with a room, taking over common areas, expanding the bathroom at the kitchen's expense.

3. Step 1: project

A qualified design organization develops the replanning project from the BTI tech passport. Cost ~5–20k UAH depending on complexity.

4. Step 2: approval & works

Notice of works start to the architectural control body or project approval — depends on complexity category. Works by a licensed contractor.

5. Step 3: acceptance & new tech passport

Works acceptance act → new BTI tech passport with the new layout → registry updates. Until then the flat legally 'doesn't match documents'.

6. Unlegalized replanning

Consequences: fine, order to restore the layout, sale problems (buyer and bank see mismatch with tech passport), insurance payout denial.

Ukraine's regulatory state changes (building codes and control-body procedures) — check the current procedure at your administrative service center. The main rule: if room boundaries or engineering systems change — no works without a project, even if 'everyone does it'.

Sobre Redistribución

Redistribución — legalization procedure: project, documents, prohibitions. Inmobiliaria: ROI renovación, gravámenes, construir o comprar, redistribución, obra nueva, herencia, seguro. Use nuestras herramientas sin registro ni instalación de software. Todos los cálculos se realizan en su navegador — sus datos nunca se envían a un servidor.