Boiler Room Piping
Scheme → node sequence and key nuances
Piping chain
- Boiler → safety group (3-bar valve, air vent, gauge)
- → expansion tank on return
- → circulation pump on return
- → manifold
- → radiators with valves
- → return to boiler
- Makeup feed with valve & check on cold line
Nuances
- •Pump on return — cooler water, longer life
- •Expansion tank ≈10% of system volume
- •Isolation valves on each branch
This scheme is a learning/communication aid. A working boiler-room project (especially gas) needs a designer — hydraulic calc, chimney and norms.